Hvac systems are a technical and critical part of any inspection it is important to understand and inspect the hvac components as a system.
Fan coil unit installation checklist.
Variable air volume units 52 54 variable air volume air handling unit 1 55 57 packaged air cooled chiller 58 59 air cooled condensing unit and dx fan coil 60 61 hot water boiler 62 63 hvac system controls 64 65.
Horizontal fan coils installation mounting instructions installation price fan coils are designed to be durable and manufactured for sturdy construction.
Cdv vertical high performance fan coil unit fan coil relay board fcrb installation operation and maintenance fan relay board 2 frbii installation operation and maintenance.
You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant clients.
Attach coil to casing flange using coil mounting screw pre viously removed.
Ensure that all units sections are thoroughly clean and free from installation debris.
Clearances allow adequate space for free air circulation service clearances piping and electrical connections and any necessary ductwork.
Download method statement for installation of fan coil units fcu s download package contains the method statement checklist for installation inspection testing plan r isk assessment.
For specific unit dimensions refer to the submittals.
Ensure that the filters are free from dust.
The units must still be handled with great care and no force or pressure applied to the coil or piping.
Adrian aw created date.
The hvac components not only supply heating and cooling to the house but they are also a critical part of the health of the home.
Complete the following checklist before installing the unit and com plete the installation checklist on page 7 to ensure proper and safe operation.
Lay fan coil unit on its right side and reinstall coil assembly with condensate pan down.
N for horizontal installation ceiling mounting it is advisable to use m8 thre aded bars screw anchors suitable for the unit s weight and to arrange for the positioning of the unit using 2 m8 bolts and a washer the diameter of which is suitable for inserting the slot and for then fixing the unit.
Pre commissioning procedure for fan coil units.
Ensure that all access panels and blanking plates are in position and are secured.
Pre commissioning checklist unit check visual inspection no apparent damage fan coil unit system item task yes no n a.
Download checklists excel sheets for hvac design and installation.
When handled the unit should be carried in an upright position holding.
Fix the standard unit to the ceiling or wall using at least 4 of the 6 slots.