Fan coil unit installation method.
2 enviro tec seisi instlltion o fn coil units nd bloe oil units form et11500 n1 0920 model hdd ceiling mounted units note.
You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant clients.
Refer to table 1.
The bearing weight of the hanger rod must be above the unit weight and the installation of the fan.
Install the fem fan coil with the accompanying kit to ensure compliance with low leak requirements of less than 2 cabinet leakage rate at 0 5 inches w c.
The fan coil unit.
Proper follow up shall ensure that the job execution complies with the requirements and serves the intended function to satisfactory level.
Sizes 08 20 unit is hung from the ceiling using strut screwed to both the top and bottom of the unit on both.
When tested in accordance with ashrae 193 standard.
Method of statement for installation of fan coil units and packaged air conditioning units.
Download method statement for installation of fan coil units fcu s download package contains the method statement checklist for installation inspection testing plan r isk assessment.
In case 2 valves are installed on the same fan coil unit 4 pipe model use the same method described above to install the second valve.
Of the supply end of the fan coil.
For all models unit size can change the instal lation method.
Adjust fan motor pulley as follows.
This procedure defines the method that will be used to ensure that the fcu packaged air conditioning units and associated refrigerant pipework and.
Ensure that the fan coil unit is properly leveled.
Baoding yuexin fan coil unit manufacturer shares the installation method of fan coil units for you.
Be sure drain line is properly and securely positioned and that the line is clear.
Instruction manual cheetah fan coil unit original instructions 8 5 0 installation general important prior to installation it is the installer s responsibility to observe the environmental and operational limitations of the equipment and ensure that they are compatible with the installation location.
After the acceptance of the arrival of the fan coil unit is completed the reserved position shall be perforated to install the hanger rod.
1 2 1 2 required thread type on the field piping side no valves installed 2 way valve s installed 3 way valve s 2 pipe unit water in 3 4 male bsp 3 4 female bsp 3 4 female bsp water out 3 4 male bsp.
Check fan and motor operation.
This method statement is prepared in order to make sure that site installation of all types fan coil units and packaged air conditioning units and associated refrigerant pipework is done as per applicable requirements and manufacturer instructions.
Pour water into drain to check.
After the completion of the installation of the fan coil unit electrical control and bms connections shall be done as per approved shop drawings.
Motor to fan wheel rotation must match the airflow direction.
The purpose of generating this method statement is to define the procedure step by step to implement the correct practices for installation of fcu ducted dx through the guide line contained here in.
Set unit air delivery of required blower rpm.